Nine days into a planned 28, a checkout test was paused. The variant with the shorter address form showed 3.40% conversion against 3.00% for control, the dashboard printed p = 0.036 in green, and the product lead wanted the result in Thursday's growth review. The analyst now owns 34,000 users of data and a slide that says "+13% conversion". Both are less solid than they look.
The pause itself is not a disaster. What matters is that nobody reports those numbers as if the test had run to plan, and that the team decides what to do next from an honest estimate. The steps below use this one test throughout, with illustrative figures, so each correction can be seen in euros and percentage points rather than in theory.
The reason it stopped decides what can be saved
Before touching the data, write down in one sentence why the test stopped and who stopped it. This is not admin. The reason determines whether the estimates are biased or only noisy, and those two problems call for different repairs.
Tests stop for four broad reasons. The first is an apparent win, as in our case: someone saw a significant result and acted on it. The second is an apparent loss or harm, such as a guardrail metric like refund rate or page latency moving the wrong way.
The third is an external event unrelated to the result: a bug in one arm, a sitewide campaign, a pricing change, an outage or the end of a budget. The fourth is a traffic shortfall, where the test simply could not reach its sample and was cut.
The key distinction is whether the decision to stop depended on the outcome. Stopping because the numbers looked good, or bad, is selection on the result. Out of all the paths the data could have taken, you kept the one that happened to cross a line, so both the p-value and the size of the effect are skewed toward the extreme.
Stopping for an external reason does not bias the estimate in the same way. You simply have less data, a wider interval and maybe an odd mix of days.
There is a middle case too. If a bug hit one arm on day 7 and someone noticed it on day 9 because the variant numbers looked strange, the stop was partly driven by the outcome. Record that honestly, then treat the data before the bug as usable and the data after it as contaminated.
Why a p-value from a peeked test says less than it claims
A fixed-horizon test promises a 5% false positive rate only if you look once, at the planned sample. Look repeatedly and stop at the first significant reading, and the true false positive rate climbs. Classic results from group sequential analysis put it at roughly 14% with 5 equally spaced looks and about 19% with 10.
Continuous checking of a live dashboard is worse still, and Evan Miller's essay "How Not To Run an A/B Test" became widely read precisely because it showed how quickly daily peeking turns noise into "winners".
The second problem is less discussed and costs more money. When a test with modest power is stopped at the moment it turns significant, the observed effect is almost always larger than the true one. Andrew Gelman and John Carlin called this a Type M error, an error of magnitude, in their 2014 paper on retrospective design. The mechanism is simple: with a small sample, only large observed differences clear the significance threshold, so conditioning on significance filters out every run where the effect happened to look ordinary.
Put the two together and the slide is wrong twice. Under daily peeking, a variant that does nothing turns green far more often than p = 0.036 implies, and if this one does something, the effect is probably smaller than 13%. Neither correction means the variant is bad. It means the evidence is weaker than the green cell suggests, and the next step is to measure by how much.
A useful habit is to ask what the dashboard would have shown on each of the previous 8 days. If the p-value was above 0.3 on day 6 and below 0.05 on day 9, the result is fragile. If it has been below 0.05 since day 4 and the interval has narrowed steadily, the evidence is stronger, though still affected by the stopping rule.
Run the numbers the dashboard did not show
Here is the illustrative test in full. The plan called for 53,000 users per arm over 28 days, which gives 80% power to detect a 10% relative lift from a 3.00% baseline at a two-sided alpha of 0.05. On day 9, each arm had 17,000 users. Control had 510 conversions, 3.00%. The variant had 578, 3.40%.
The difference is 0.40 percentage points. Its standard error is the square root of 0.03 × 0.97 / 17,000 plus 0.034 × 0.966 / 17,000, about 0.191 points, so z is about 2.10 and the two-sided p-value is about 0.036. The 95% confidence interval runs from roughly +0.03 to +0.77 points, a relative lift somewhere between +1% and +26%. That range is the first thing to put on the slide, because it already shows how little the point estimate pins down.
Next, achieved power. With 17,000 per arm, a true lift of 10% (0.30 points) would produce z of about 1.58 on average, giving power of roughly 35%. A test with 35% power that comes out significant must have observed at least 1.96 × 0.19, about 0.37 points, which is a 12% lift. So even if the true effect is exactly the 10% the team hoped for, any significant result at this sample would report at least 12%, and typically more. The exaggeration is built in.
Finally, ask what a planned interim analysis would have required. An O'Brien-Fleming design with 3 looks sets the z boundaries at about 3.47, 2.45 and 2.00. Day 9 is roughly a third of the planned information, so the first boundary applies, and z of 2.10 is nowhere near 3.47. Applied after the fact this is only a rough guide, but it tells the team that a test designed for early stopping would not have stopped here.
In plain words for Thursday's review: the variant is probably not worse, it may well be better, the likely lift is smaller than 13%, and the data cannot yet tell a 2% lift from a 20% one.
A salvage procedure, step by step
The order matters, because some checks can invalidate everything after them.
- Freeze the dataset. Export assignments and events up to the stop timestamp, record the stop reason in one sentence, and note who made the call. Later debates go faster when this exists.
- Test for sample ratio mismatch. With a 50/50 split, 17,000 versus 17,000 is clean; 17,000 versus 16,200 would give a chi-square p-value far below 0.001 and signal broken assignment, in which case stop here and fix the pipeline.
- Check data quality around the stop. Look for logging gaps, a deploy, a bug window or bot traffic in the final 48 hours. Drop contaminated days explicitly and say so.
- Report the effect with its interval, not the p-value alone. Here, +0.40 points, 95% CI +0.03 to +0.77.
- Apply a stopping correction. Use an alpha spending boundary such as O'Brien-Fleming or Pocock as if the looks had been planned, or recompute with the sequential method your platform supports.
- Compute achieved power and the minimum detectable effect at the actual sample. At 17,000 per arm, the 80% power MDE is about 0.53 points, roughly an 18% relative lift.
- Shrink the estimate. If past checkout tests on this site produced lifts mostly between -5% and +8%, a simple Bayesian model with that prior will pull the 13% toward the low single digits, and that shrunken figure is what belongs in a revenue forecast.
- Check calendar coverage. Nine days include one full week plus two weekdays, so weekend shoppers are under-represented relative to a 28-day run.
- Decide among shipping with a holdback, extending, rerunning or dropping the variant, and write the decision down with the numbers from steps 4 to 7.
Most of this takes an afternoon in SQL and a notebook. The step most often skipped is the seventh, and it is the one that stops a forecast from promising revenue that never arrives.
When stopping early was the right decision
There is a strong case for stopping early, and in some situations it wins outright. If a guardrail breaks, waiting to reach a planned sample while customers hit a payment error is not rigour. Clinical trials have independent data monitoring committees whose job includes stopping a trial for harm or overwhelming benefit, and product teams need the equivalent: a pre-agreed threshold, such as a refund rate 20% above control, at which any analyst may halt a test without asking.
Opportunity cost is another real argument. A test holding half of checkout traffic on an inferior experience for 28 days has a price. If the variant were truly 10% better at a 3% baseline, on 4,000 daily checkout visitors with a €60 average order value, the control arm would forgo about 6 orders a day, roughly €360.
Over 19 remaining days that is close to €7,000. For a large retailer this is noise. For a small shop it is a reason to use a design that allows early stops legitimately.
That design exists, and this is the strongest version of the counterargument. Sequential methods let you look as often as you like while keeping the error rate honest. Optimizely's Stats Engine is built on always-valid inference from the mixture sequential probability ratio test, and platforms such as Eppo and Statsig offer sequential testing modes. Group sequential designs with O'Brien-Fleming or Pocock boundaries have been standard in clinical research for decades. Under any of these, stopping on day 9 is fine if the boundary is crossed.
The lesson from our test is narrower. Stopping early was not the error. Stopping early under a rule designed for one look at the end was.
Ship, extend or rerun: choosing the next move
With the salvage numbers in hand, the choice is usually clear. Four options cover nearly every case.
Shipping with a holdback fits when the interval excludes harm, the change is cheap to reverse and the team needs to move. In our example the lower bound sits just above zero, so shipping the shorter form to 95% of traffic and keeping a 5% holdback for four weeks is defensible. The holdback measures the real effect without blocking the launch, though at 5% it needs a long window to give a tight estimate.
Extending the same test fits when the stop was for an external reason and nothing about either arm changed. You can resume, but count the earlier look when you set the final threshold. Do not simply append new days and test at 0.05 as if nothing happened.
A fresh rerun fits when the variant was modified during the pause, the bug contaminated a large share of the data, or the business decision is expensive enough that a 35%-powered result cannot carry it. Pre-register the duration, sample and stopping rule before the new run starts.
Dropping the variant fits when the interval is wide, centred near zero and the change has ongoing cost: a new vendor, extra page weight, or a form that support will have to explain.
Whichever you pick, the write-up should state the stop reason, the corrected interval, the achieved power and the shrunken estimate. Someone reading it in six months, when conversion has drifted for unrelated reasons, will need those four numbers more than the original p-value.
A checklist so the next test does not end this way
Most early stops are preventable at the design stage, before a single user is assigned. A short pre-launch review catches the usual causes.
- The planned sample, duration in full weeks and primary metric are written down and visible on the test page.
- The stopping rule is explicit: either "no decision before day 28" or a named sequential method with its boundaries.
- Guardrail metrics have numeric thresholds that justify an immediate stop, and the people allowed to call one are named.
- The dashboard hides or greys out p-values until the planned sample is reached, unless a sequential method is in use.
- An automated sample ratio mismatch alert runs daily, so a broken split is caught on day 2 rather than day 9.
- The expected lift is checked against the history of similar tests, so a power calculation built on a 10% hope is caught when the site's typical lift is 3%.
- Stakeholders have agreed in advance what result would lead to shipping, extending or dropping, which removes most of the pressure to peek.
None of these items requires new tooling. They require a decision before launch about how the test will be read.
The direction of travel is already visible in the platforms. More experimentation tools now default to sequential or always-valid intervals, which makes peeking safe, and the argument is moving to a harder question: across a programme of 50 or 100 tests a year, how many "winners" are real once you account for every look and every metric?
Teams that start shrinking estimates and tracking their false discovery rate now will have answers when finance asks where the forecast revenue went. Day 9 is a good place to start that habit.